A large west coast catering company with lunch program contracts at 130 private schools needed a conveyor to perform as an assembly line for 6000 sandwiches prepared daily. They required a 24 ft length of conveyor with a low cost alternative to stainless steel construction, it must be easily dissembled by one person for sanitizing and [...]
